Close Menu
    What's New

    Heavy thunderstorms, flash flood risk forecast across parts of Saudi Arabia

    September 13, 2026

    Dubai landlords can evict tenants to move into their own property — but must give 12 months’ notice

    September 13, 2026

    Nepal estimates flood reconstruction cost at $4.78 billion

    September 13, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf GazetteThe Gulf Gazette
    • Home
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf GazetteThe Gulf Gazette
    Home»UAE»Watch: Dubai Metro Blue Line’s first phase of tunneling finished in record time
    UAE

    Watch: Dubai Metro Blue Line’s first phase of tunneling finished in record time

    Editorial TeamBy Editorial TeamJuly 8, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    Dubai’s metro expansion is being built with the help of advanced engineering technology, as the Roads and Transport Authority (RTA) continues to use smart construction methods to improve speed, accuracy and efficiency.

    Latest techniques are being deployed in tunnelling works to support the emirate’s growing transport network and future infrastructure needs.

    In a video published on Wednesday, the RTA showed how, before the metro station is built, an engineering journey unfolds underground.

    Stay up to date with the latest news. Follow KT on WhatsApp Channels.

    Months ago, Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, inaugurated the tunnel boring works for the Dubai Metro Blue Line. On Wednesday, the RTA informed that the first phase of tunnelling works have been completed.

    The video also elaborated on how the tunnelling journey began. In 2007, the RTA introduced its first tunnel boring machines, marking a major engineering breakthrough at the time. The tunnelling works took around 7 months, with an average progress rate of 12 metres per day.

    “Today, ‘Al Wugeisha’ leads a new era of development, a massive tunnel boring machine equipped with the latest digital guidance and monitoring systems, delivering higher efficiency and greater precision. The machine has achieved a record production capacity of 30 metres per day, completing the first phase of tunnelling works in just two months,” RTA said in the video.

    Al Wugeisha is the tunnel boring machine that is 163 metres long, weighs more than 2,000 tonnes, and operates around the clock. Its average excavation advance rate ranges from 13 to 17 metres per day.

    “In less than two decades, Dubai has doubled its capabilities, accelerated it’s achievements and set new standards in tunnel engineering. This is Dubai-it, and the Blue Line journey has just begun,” the RTA added.

    Watch the video here:

    The Dh18-billion Blue Line is scheduled to open on September 9, 2029, coinciding with the 20th anniversary of the Dubai Metro. Spanning 30km, the project features 14 stations. About half of the track will be underground, while the rest will remain above ground.

    Source: Khaleej Times

    Previous ArticleAI-powered SparX Innovation Hub opens at Expo City Dubai
    Next Article Top five governance controls every UAE enterprise needs before deploying AI agents

    Related Posts

    Dubai landlords can evict tenants to move into their own property — but must give 12 months’ notice

    September 13, 2026

    Nepal estimates flood reconstruction cost at $4.78 billion

    September 13, 2026

    UAE extends condolences over victims of fire at two schools in DR Congo

    September 13, 2026
    Latest Posts

    Heavy thunderstorms, flash flood risk forecast across parts of Saudi Arabia

    September 13, 2026

    Dubai landlords can evict tenants to move into their own property — but must give 12 months’ notice

    September 13, 2026

    Nepal estimates flood reconstruction cost at $4.78 billion

    September 13, 2026

    Empty pages full of potential threats: Kaspersky warns about the dangers of parked domains

    September 13, 2026
    Don't Miss

    Heavy thunderstorms, flash flood risk forecast across parts of Saudi Arabia

    By Editorial TeamSeptember 13, 2026

    JEDDAH — Moderate to heavy thunderstorms that could lead to flash floods are forecast across…

    Austria’s inflation rate up by 0.9% to 3.1% in March

    April 1, 2026

    Saudi FM, UN chief discuss regional developments in phone call

    April 1, 2026
    2026. All rights reserved.
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.