Close Menu
    What's New

    Colombia ends peace talks with armed groups, abandons ‘Total Peace’ strategy

    September 12, 2026

    GDRFA Dubai to showcase Click and Travel, Red Carpet service at Arabian Travel Market

    September 12, 2026

    From Kottayam to King’s College: UK nurse shares her journey to winning Aster Guardians Award

    September 12, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf GazetteThe Gulf Gazette
    • Home
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf GazetteThe Gulf Gazette
    Home»UAE»Masdar begins commercial operations at second UK battery storage project
    UAE

    Masdar begins commercial operations at second UK battery storage project

    Editorial TeamBy Editorial TeamAugust 24, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    LONDON, 24th August, 2026 (WAM) — Abu Dhabi Future Energy Company PJSC – Masdar, a global clean energy leader, has strengthened its commitment to UK energy security with its second battery energy storage system (BESS) project in the country starting commercial operations.

    The opening of the facility in Rochdale is the latest milestone in Masdar’s planned £1 billion investment program in BESS projects in the UK.

    The 35-megawatt (MW)/70-megawatt-hours (MWh) Rochdale plant will provide enough clean power for 35,000 homes per day, based upon two charging and discharging cycles per day.

    The facility will also provide critical grid balancing services, responding to fluctuations in supply and demand within milliseconds to help maintain a secure and reliable electricity network.

    Following its acquisition of Arlington Energy in 2022, Masdar committed to developing a 3 gigawatt-hours (GWh) pipeline of BESS projects in the UK, one of the largest in the country. The portfolio will play a vital role in supporting the integration of renewables into the country’s energy mix and enhancing grid stability, to lower consumer bills.

    The investment is aligned with the UK government’s Clean Power 2030 Action Plan, which is targeting building up to 27GW of battery storage by the end of this decade.

    Husain Al Meer, Executive Director, Global Offshore Wind & UK, Masdar said, “Beginning commercial operations at our Rochdale facility is a key milestone in our £1 billion commitment to UK battery storage. As electricity demand grows and renewable generation continues to expand, battery storage is becoming an increasingly vital component of maintaining a secure, reliable and affordable electricity network.

    “Our continuing rollout of our £1 billion pipeline reflects Masdar’s long-term commitment to the UK, and we are proud to be supporting the country’s energy security by delivering the flexible infrastructure needed to enable greater renewable energy deployment.”

    The Rochdale project follows Masdar’s 20MW/40MWh Welkin Road project in Stockport beginning commercial operations last December.

    The company is also currently developing projects in Chesterfield and Cardiff, which will have a combined capacity of 150MW/300MWh. Project financing for the four projects was successfully completed last month, with Masdar securing up to £97 million from SMBC and ING.

    BESS solutions are critical to integrating renewables into modern electricity networks, providing flexible energy to the grid by storing energy in periods of low demand and releasing it at peak times. This flexibility enhances grid stability and energy security, supports the integration of renewable energy, and contributes to lowering consumer bills and carbon emissions.

    Built to international standards of safety and security, Masdar’s BESS projects incorporate state-of-the-art fire detection and suppression systems, with 24-hour CCTV monitoring and local response capability.

    The company’s UK BESS projects are also being built in close consultation with local stakeholders to ensure they deliver positive impact to local communities as well as providing tangible national economic benefit.

    As electricity demand accelerates, driven by electrification and the rapid expansion of artificial intelligence (AI) and digital infrastructure, Masdar is strengthening its global leadership position in battery storage. Last October, Masdar broke ground in Abu Dhabi on the world’s first gigascale 24/7 solar and battery storage project, which will combine a 5.2GW solar plant with a 19GWh BESS to deliver up to 1GW baseload power every day.

    Beyond battery storage, Masdar is a leading investor, developer, and operator in the UK offshore wind sector. Major UK projects include a €5.2 billion co-investment with Iberdrola in the 1.4GW East Anglia THREE offshore wind facility, which will power the equivalent of 1.3 million homes, and the 3GW Dogger Bank South offshore wind farm being developed in partnership with RWE.

    Masdar has built one of the world’s fastest-growing renewable energy portfolios, with more than 65GW of capacity across established and high-growth renewable energy markets, spanning technologies including solar, onshore wind, offshore wind, battery storage and hybrid solutions.

    With a clear pathway to 100GW of energy capacity by 2030, Masdar continues to expand through disciplined investment in strategic markets, delivering reliable, affordable clean power to meet rapidly growing electricity demand while supporting energy security and economic growth.

    Source: Emirates News Agency

    Previous ArticleNew Zealand plans social media ban for under-16s
    Next Article Tenable advances exposure management with coverage across every major AI platform and developer tool

    Related Posts

    GDRFA Dubai to showcase Click and Travel, Red Carpet service at Arabian Travel Market

    September 12, 2026

    UAE’s Sheikh Khaled joins leaders at Brics 2026 as Modi calls for stronger trade ties

    September 12, 2026

    Abu Dhabi Crown Prince meets Iranian President on sidelines of Brics summit in India

    September 12, 2026
    Latest Posts

    Colombia ends peace talks with armed groups, abandons ‘Total Peace’ strategy

    September 12, 2026

    GDRFA Dubai to showcase Click and Travel, Red Carpet service at Arabian Travel Market

    September 12, 2026

    From Kottayam to King’s College: UK nurse shares her journey to winning Aster Guardians Award

    September 12, 2026

    Broadcom introduces VMware Private AI Cloud, enabling enterprises to scale AI cost-effectively

    September 12, 2026
    Don't Miss

    Colombia ends peace talks with armed groups, abandons ‘Total Peace’ strategy

    By Editorial TeamSeptember 12, 2026

    BOGOTA — Colombian President Abelardo De La Espriella formally ended all peace negotiations with illegal…

    Austria’s inflation rate up by 0.9% to 3.1% in March

    April 1, 2026

    Saudi FM, UN chief discuss regional developments in phone call

    April 1, 2026
    2026. All rights reserved.
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.