Close Menu
    What's New

    Zayed Sustainability Prize expands support to 22 runner-up projects

    June 9, 2026

    Huawei launches EduTech1.0 framework to advance Intelligent Education and Digital Talent Development

    June 9, 2026

    Sharjah Chamber, Portuguese Business Council explore ways to strengthen economic partnership

    June 9, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf GazetteThe Gulf Gazette
    • Home
    • UAE
    • KSA
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf GazetteThe Gulf Gazette
    Home»Technology»FANR: Electrical generator fire outside Barakah Plant perimeter did not affect its safety, basic systems readiness
    Technology

    FANR: Electrical generator fire outside Barakah Plant perimeter did not affect its safety, basic systems readiness

    Editorial TeamBy Editorial TeamMay 20, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    ABU DHABI, 17th May, 2026 (WAM) — The Federal Authority for Nuclear Regulation (FANR) stated that it is continuing to closely monitor the incident involving a fire in an electrical generator located outside the inner perimeter of the Barakah Nuclear Power Plant in the Al Dhafra Region, caused by a drone strike.

    FANR confirmed that the incident did not affect the safety of the Barakah Nuclear Power Plant or the readiness of its essential systems.

    There has been no release of radioactive material, radiological safety levels remain within normal ranges, and there is no risk to the public or the environment. No injuries have been reported.

    FANR are maintaining close coordination with the plant operator and the relevant national authorities to verify all aspects of the incident and to confirm the continued integrity and readiness of plant systems.

    As part of its independent regulatory oversight, FANR is assessing the event in accordance with established national procedures and maintaining continuous monitoring of radiological conditions and plant status.

    The Barakah Nuclear Power Plant was designed, licensed, and is operated in accordance with the highest international standards of nuclear safety and security. Multiple independent layers of protection are built into every aspect of the plant’s design and operation to ensure the safe and secure production of clean electricity under a wide range of conditions.

    The protection of the public, workers, and the environment remains FANR’s highest priority. The Authority will continue to provide rigorous and independent regulatory oversight to ensure the continued safe and secure operation of the Barakah Nuclear Power Plant.

    FANR encourages the public to rely on official sources for accurate information and to avoid sharing rumours or unverified reports. Further updates will be provided as additional verified information becomes available.

    Source: Emirates News Agency

    Previous ArticleCisco unveils its Universal Quantum Switch
    Next Article Swatch’s ‘Royal Pop’ launch sparks buying frenzy as resale prices surge

    Related Posts

    Huawei launches EduTech1.0 framework to advance Intelligent Education and Digital Talent Development

    June 9, 2026

    BeyondTrust selected for Project Glasswing to help secure critical digital infrastructure

    June 9, 2026

    MBRSC announces successful ISS experiment by UAEU team in Asian try zero-G 2025

    June 9, 2026
    Latest Posts

    Zayed Sustainability Prize expands support to 22 runner-up projects

    June 9, 2026

    Huawei launches EduTech1.0 framework to advance Intelligent Education and Digital Talent Development

    June 9, 2026

    Sharjah Chamber, Portuguese Business Council explore ways to strengthen economic partnership

    June 9, 2026

    ‘Map Your Dubai’ lets residents vote for culinary gems that best capture city’s flavour

    June 9, 2026
    Don't Miss

    Austria’s inflation rate up by 0.9% to 3.1% in March

    By Editorial TeamApril 1, 2026

    VIENNA,1st April, 2026 (WAM) — Austria’s inflation rate rose by 0.9% to 3.1% in March,…

    Saudi FM, UN chief discuss regional developments in phone call

    April 1, 2026

    Saudi, Greek defense ministers discuss repercussions of Iranian attacks

    April 1, 2026
    2026. All rights reserved.
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports

    Type above and press Enter to search. Press Esc to cancel.