Close Menu
    What's New

    FIFA World Cup 2026: Mexico start in style, beating Bafana Bafana 2-0

    June 12, 2026

    Third cohort of Financial Market Pioneers Programme graduates

    June 11, 2026

    BenQ Unveils AI-Powered RP05 Interactive Whiteboard for Future-Ready Classrooms in the Middle East

    June 11, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf GazetteThe Gulf Gazette
    • Home
    • UAE
    • KSA
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf GazetteThe Gulf Gazette
    Home»UAE»SDPW to complete Midline drainage project by early next year
    UAE

    SDPW to complete Midline drainage project by early next year

    Editorial TeamBy Editorial TeamApril 27, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    SHARJAH, 27th April, 2026 (WAM) — Sharjah Department of Public Works (SDPW) is implementing the Midline project for rainwater and groundwater drainage at a cost of AED500 million, marking one of the emirate’s largest strategic infrastructure developments.

    The project enhances drainage efficiency across key areas through an integrated engineering system extending over long distances and serving densely populated districts. Despite much of the work being underground, it plays a critical role in preventing water accumulation, maintaining traffic flow, and safeguarding urban life.

    The development is divided into three interconnected zones. The first includes a 16 km main transmission and secondary network constructed using micro-tunnelling at depths of up to 20 metres, forming the system’s backbone and directing water towards the sea.

    The second zone comprises two main pumping stations at Al Ghubayba and Al Sour. Al Ghubayba station, with a capacity of 6.2 cubic metres per second, serves multiple areas including Al Ghubayba, Al Tala’a, Al Rifa’a, Al Shahba, Al Darari, Al Tarfa, Dasman, Samnan, parts of Industrial Area 4, Al Wahda Street, Wasit Street and Abu Shaghara Tunnel, supported by 6.6 km of collection lines.

    Al Sour station, with a capacity of 5.7 cubic metres per second, serves areas such as Al Shuwaiheen, Al Ghuwair, Al Musalla, Al Manakh, Al Yarmook, Al Mureijah, Umm Al Tarafa, Al Mahatta, Al Jubail, Al Sour, Al Nad, Al Majaz, Abu Shaghara and parts of King Faisal Road, with 3.3 km of collection lines.

    The third zone includes marine outfalls and 55 inspection chambers, ranging from 15 to 20 metres in depth and up to 12 metres in diameter, ensuring efficient maintenance and safe operations.

    The project is being delivered in two phases. The first phase, scheduled for completion by the end of 2026, covers areas including Al Nad, Abu Danig, Al Mahatta, Al Yarmook, King Abdulaziz Street and Abu Shaghara Tunnel. The second phase, expected in the first half of 2027, will extend coverage to additional districts and major roads such as King Faisal, Al Wahda and Wasit.

    Micro-tunnelling accounts for 15 km of the project, compared to just 800 metres of open excavation, minimising disruption. A total of 5,267 GRP pipes, each 3 metres long and with a lifespan exceeding 50 years, have been installed. The system operates through gravity flow, directing water to pumping stations and then to the sea.

    More than 651 workers contributed to the project, achieving two million safe working hours. Covering 4,000 hectares, the project reflects Sharjah’s commitment to resilient infrastructure capable of addressing climate change impacts and ensuring sustainable drainage services across the emirate.

    Source: Emirates News Agency

    Previous ArticleSaudi Arabia records major healthcare gains, reaches 97.5% satisfaction
    Next Article CFI Financial Group reports record Q1 2026 performance, surpassing $2.3 trillion in trading volume

    Related Posts

    Third cohort of Financial Market Pioneers Programme graduates

    June 11, 2026

    Zayed Sustainability Prize expands support to 22 runner-up projects

    June 9, 2026

    Sharjah Chamber, Portuguese Business Council explore ways to strengthen economic partnership

    June 9, 2026
    Latest Posts

    FIFA World Cup 2026: Mexico start in style, beating Bafana Bafana 2-0

    June 12, 2026

    Third cohort of Financial Market Pioneers Programme graduates

    June 11, 2026

    BenQ Unveils AI-Powered RP05 Interactive Whiteboard for Future-Ready Classrooms in the Middle East

    June 11, 2026

    This free children’s theatre festival in Dubai is giving kids a break from screens

    June 11, 2026
    Don't Miss

    Austria’s inflation rate up by 0.9% to 3.1% in March

    By Editorial TeamApril 1, 2026

    VIENNA,1st April, 2026 (WAM) — Austria’s inflation rate rose by 0.9% to 3.1% in March,…

    Saudi FM, UN chief discuss regional developments in phone call

    April 1, 2026

    Saudi, Greek defense ministers discuss repercussions of Iranian attacks

    April 1, 2026
    2026. All rights reserved.
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports

    Type above and press Enter to search. Press Esc to cancel.