Close Menu
    What's New

    FTA highlights experience in expanding smart tax systems at Belt and Road Initiative Tax Administration Cooperation Forum

    October 28, 2026

    Qatar among the first to adopt Baxter’s secure, connected vital signs monitoring technology

    October 28, 2026

    Dubai Content Creators Programme equips participants to bring the city’s economic and tourism story to global audiences

    October 28, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf GazetteThe Gulf Gazette
    • Home
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf GazetteThe Gulf Gazette
    Home»UAE»Saudi Arabia announces full pumping capacity through 7 mbpd East–West pipeline
    UAE

    Saudi Arabia announces full pumping capacity through 7 mbpd East–West pipeline

    Editorial TeamBy Editorial TeamApril 12, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    RIYADH, 12th April, 2026 (WAM) — The Saudi Ministry of Energy announced today the success of operational and technical efforts in restoring the full pumping capacity through the East–West pipeline, amounting to approximately seven million barrels per day (mbpd), and recovering the affected volumes from the Manifa field production of around 300,000 barrels per day, all within a short period of time.

    The Saudi Press Agency (SPA) reported that further to the statement issued by the Ministry of Energy on April 9, 2026, regarding the impact on certain facilities of the Kingdom’s energy sector due to the attacks, including the loss of approximately 700,000 barrels per day of pumping capacity through the East–West pipeline, and the reduction in production at the Manifa field by about 300,000 barrels per day, in addition to the impact on production at the Khurais field by about 300,000 barrels per day, the ministry announced the success of operational and technical efforts in this regard.

    With regard to the Khurais field, work is still ongoing to restore full production capacity, and this will be announced upon completion,” it added.

    Source: Emirates News Agency

    Previous ArticleDubai: Young ‘Sheikh of happiness’ distributes flags following Sheikh Mohammed’s call
    Next Article Abu Dhabi Crown Prince to begin China visit to boost ties, cooperation

    Related Posts

    FTA highlights experience in expanding smart tax systems at Belt and Road Initiative Tax Administration Cooperation Forum

    October 28, 2026

    Dubai Content Creators Programme equips participants to bring the city’s economic and tourism story to global audiences

    October 28, 2026

    European Commission presents Climate Resilience Framework for a better prepared and protected Europe

    October 28, 2026
    Latest Posts

    FTA highlights experience in expanding smart tax systems at Belt and Road Initiative Tax Administration Cooperation Forum

    October 28, 2026

    Qatar among the first to adopt Baxter’s secure, connected vital signs monitoring technology

    October 28, 2026

    Dubai Content Creators Programme equips participants to bring the city’s economic and tourism story to global audiences

    October 28, 2026

    European Commission presents Climate Resilience Framework for a better prepared and protected Europe

    October 28, 2026
    Don't Miss

    Austria’s inflation rate up by 0.9% to 3.1% in March

    By Editorial TeamApril 1, 2026

    VIENNA,1st April, 2026 (WAM) — Austria’s inflation rate rose by 0.9% to 3.1% in March,…

    Saudi FM, UN chief discuss regional developments in phone call

    April 1, 2026

    Saudi, Greek defense ministers discuss repercussions of Iranian attacks

    April 1, 2026
    2026. All rights reserved.
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.