Close Menu
    What's New

    More UAE employees are claiming life insurance in their 30s and 40s: Report

    October 29, 2026

    ADGM becomes region’s first international financial centre to publish dedicated crypto mining Guidance

    October 29, 2026

    EDGE completes first dynamic test firing of UAE-designed 155mm extended range artillery ammunition

    October 29, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The Gulf GazetteThe Gulf Gazette
    • Home
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    The Gulf GazetteThe Gulf Gazette
    Home»KSA»Riyadh to build tunnel, 4 bridges at Thumamah–Othman intersection
    KSA

    Riyadh to build tunnel, 4 bridges at Thumamah–Othman intersection

    Editorial TeamBy Editorial TeamApril 16, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    RIYADH — The Royal Commission for Riyadh City (RCRC) has announced plans to construct a tunnel and 4 elevated bridges at the intersection of Thumama Road and Uthman ibn Affan Road.

    As part of the RCRC’s Road Axes Development Program and the Thumamah–Othman bin Affan intersection development project —falling within the Ring Roads and Major Axes Development Program — this initiative aims to enhance traffic flow and improve connectivity efficiency between the main roads.

    The four main bridges, totaling 2,000 meters in length, are intended to ensure seamless connectivity between the directions without traffic.

    As for the main tunnel — at 850 meters in length — it will be accompanied by three lanes from each direction, converting the Othman Road into a free-flow corridor and ensuring uninterrupted flow along Thumamah Road.

    In addition, the service roads will have two lanes in each direction to serve neighborhoods and local activities.

    In addition to traffic flow, the RCRC expects this initiative to aid in reducing travel time, improving road safety, enabling efficient emergency responses, lowering emissions, enhancing urban landscaping, increasing investment value, and improving network connectivity.

    The RCRC has taken measures to avoid congestion during the implementation phase. The measures include establishing temporary traffic diversions to regulate and facilitate movement, Continuous on-site monitoring, installing clear directional signage to guide drivers to alternative routes, and implementing precautionary measures to enhance safety in the project area.

    Source: Saudi Gazette

    Previous ArticleEurozone annual inflation reaches 2.6% in March
    Next Article Saudi Arabia offers condolences to Türkiye over Kahramanmaraş school incident

    Related Posts

    Trump administration unlawfully fired prosecutor Maurene Comey, judge rules

    October 27, 2026

    Saudi Arabia recalls 1,355 Ford, Lincoln vehicles over windshield wiper defect

    October 26, 2026

    Crown Prince receives message from Kazakhstan president 

    October 26, 2026
    Latest Posts

    More UAE employees are claiming life insurance in their 30s and 40s: Report

    October 29, 2026

    ADGM becomes region’s first international financial centre to publish dedicated crypto mining Guidance

    October 29, 2026

    EDGE completes first dynamic test firing of UAE-designed 155mm extended range artillery ammunition

    October 29, 2026

    CBUAE maintains Base Rate at 3.9%

    October 29, 2026
    Don't Miss

    Austria’s inflation rate up by 0.9% to 3.1% in March

    By Editorial TeamApril 1, 2026

    VIENNA,1st April, 2026 (WAM) — Austria’s inflation rate rose by 0.9% to 3.1% in March,…

    Saudi FM, UN chief discuss regional developments in phone call

    April 1, 2026

    Saudi, Greek defense ministers discuss repercussions of Iranian attacks

    April 1, 2026
    2026. All rights reserved.
    • KSA
    • UAE
    • GCC
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.